1. When the machine needs to be lifted during transportation and installation, the application rope should be hung on the hoisting angle of the machine.
2. The machine shall be mounted on solid, flat ground.
3. Be sure to install the machine on a spacious processing site, in order to meet the working conditions of the machine.
4. Check if the machine is installed horizontally, adjust the four horizontal bolts, to adjust the machine level if necessary.
5. The power cord must be well connected, do not hinder the work.
6. The machine's power supply is three-phase four-wire 415VAV + PE.